Tables and description details of deployments and recoveries dates, locations of all field components to the Long Bay Study.



  Bottom Frame Mid-Level Near Surface
  30 m 15m 5m
LB1 Inner Shelf
ADCP (600kHz), CTD, Chl/Turb
1 release
(15m) CT, Chl/Turb (5m) CTDw/p, Chl/Turb
  75 m 0-75m
LB2 Shelf Break
ADCP (300kHz), CTD, Chl/Turb
1-2 releases
CTD, DO, Chl/Turb/CDOM
Seahorse Profiler
  200 m 0-200m
LB3 Upper Slope ADCP (150 kHz)
CTD w/p, Chl
2 releases
CTD, DO, Chl, Turb, Scatt
Slocum Glider (Ramses) hold station and profile
    0-100m
Cross-Shelf   CTD, DO, Chl, Turb, Scatt
Slocum Glider (Pelagia) transects
     

Table 1. Overview of field program components.



Latitude Longitude Water Depth
Deployed (UTC)
Recovered (UTC)
Ship Operations
Deployment Cruise
SAV11-40

2011-12-01
2011-12-02
Deployment Cruise
SAV11-44

2011-12-13
2011-12-16
Deployment Cruise
SAV12-02

2012-01-18
2012-01-21
Leg 1 Cruise
SAV12-03

2012-01-24
2012-02-02
Leg 2 Cruise
SAV12-05

2012-02-13
2012-02-26
Leg 3 Cruise
SAV12-11

2012-03-13
2012-03-23
Recovery Cruise
SAV12-14

2012-04-02
2012-04-05
LB1 (Shelf)
Taut-line Mooring
33 10.353 N
78 19.800 W
31 m
2012-01-20 15:15
2012-04-04
Bottom Frame
33 10.172 N
78 20.007 W
31 m
2012-01-20 15:55
2012-04-04 13:40
LB2 (Shelf Break)
Seahorse Package 32 56.491 N
78 05.667 W
76 m
2012-01-19 19:50
2012-02-07 **
Bottom Frame
32 56.419 N
78 05.926 W
76 m
2012-01-19 20:50
2012-04-03 15:50
LB3 (Upper Slope)
Bottom Frame
32 51.142 N 78 00.793 W 171 m
2011-12-14 18:50
2012-04-03 17:30
Ramses (Jan 2012)


2012-01-26 00:58
2012-02-14 13:28
Ramses (Feb 2012)



2012-02-15 20:45
2012-03-14 18:57
Ramses (Mar 2012)



2012-03-16 15:31
2012-04-03 20:24
Cross-shelf
Pelagia (Jan 2012)


2012-01-26 13:22
2012-02-14 17:19
Pelagia (Feb 2012)



2012-02-16 18:35
2012-03-08 14:42
Pelagia (Mar 2012)



2012-03-16 21:03
2012-04-04 12:16

Table 2. Details of mooring and glider deployments.  All times are UTC unless otherwise noted.

** Inductive Modem stopped -- early Feb, 2012 (unmoored in March, 2012 -- still tracking as of Nov 2012)