Field Operations
Up one levelProducts here were generated during the field operations of the project, in support of mission critical decisions for data collection.
- Summary of Ship Cruises
- SAV11-34 -- Acrobat Shakedown Cruise
- October 17-18, 2011 -- SAV11-34
- SAV11-36 -- Glider Shakedown Cruise
- November 13-16, 2011 -- SAV11-36
- SAV11-40 -- Glider test cruise
- SAV11-44 -- Deployment Cruise
- Dec 2011 operations in Long Bay. SAV11-44
- SAV12-02 -- Deployment Cruise
- SAV12-03 -- Leg 1 cruise
- Jan 2012 operations in Long Bay. SAV12-03
- SAV12-05 -- Leg 2 cruise
- Feb 2012 operations in Long Bay--SAV12-05.
- SAV12-11 -- Leg 3 cruise
- March 2012 operations in Long Bay. SAV12-11
- SAV12-14 -- Recovery Cruise
- April 2012 operations in Long Bay-- SAV12-14.
- Glider Tracks
- Glider surfacing positions during Cruise Legs 1-3 (January 25 - April 3, 2012).