Personal tools
You are here: Home Platforms Lookout Shoals Research Buoy Work Log
Document Actions

Work Log

Team members manually update this log whenever maintenance or events occur which affect the data reported by or status of LSRB.

See the Restructured Text primer and quick reference for making additions to this table.

Date/Time
YYYY-MM-DD HH:MM
Who Description
2007-05-01 SH
Buoy placed at IMS dock for in-water testing
2007-05-17 SH
Compass serial stream stopped reporting. We are getting timeout errors in data for
buoy attitude data but the analog values are still being read.
2007-05-25 SH
Repaired RH/Temp installed (need S/N)
2007-05-31 SH
Attempt to deploy but failed, back at dock but out of water
2007-06-04 to 07 SH
TS Barry. Buoy on dock at IMS
2007-06-07 SH
Wind Directions for both anemometers are showing measured data is out-of-whack
2007-06-12 SH
DEPLOYED at Lookout Shoals
2007-06-21 SH
Compass analog starts no longer reading 0-1 volt mostly all >1.0 volt
2007-06-26 SH
CTDA and CTDB installed on location
2007-08-30 TW
Bottom tripod swapped with second system (for regular maintenance)
2007-09-27 TW
REMOVED for service Bottom tripod still on site for autonomous collection
2007-12-11 TW
Bottom tripod removed for service (not replaced)
Initials Who
HS Harvey
RL Rick
CC Chris
TW Tony
JC Jesse
SH Sara

Powered by Plone, the Open Source Content Management System